Key Facts
- ✓ Building EV chargers in cities can be painfully slow.
- ✓ Voltpost is scaling its next-generation lamppost charger.
- ✓ The charger is designed to be installed in hours, not months.
- ✓ Voltpost is working with EVSE on the deployment.
Quick Summary
Voltpost is scaling its next-generation lamppost charger, designed to be installed in hours rather than months. The company is partnering with EVSE to deploy this technology across US cities.
The initiative addresses the slow pace of building EV chargers in urban environments. By utilizing existing infrastructure, the partnership aims to streamline the installation process and accelerate the availability of charging stations for electric vehicles.
Addressing Urban Charging Delays
Building EV chargers in cities can be a painfully slow process. Traditional infrastructure projects often face significant hurdles, including extensive permitting requirements and construction timelines that can span months or even years. These delays create a bottleneck in the expansion of necessary charging networks, hindering the adoption of electric vehicles in dense population centers.
Voltpost aims to disrupt this standard model with its innovative lamppost charger technology. By integrating charging capabilities into existing street furniture, the company eliminates the need for extensive ground-up construction. This approach is specifically engineered to reduce installation times from months down to mere hours, offering a rapid solution to the growing demand for urban charging access.
The Voltpost and EVSE Partnership
The collaboration between Voltpost and EVSE is central to the deployment strategy. This partnership combines Voltpost's hardware innovation with EVSE's expertise in the electric vehicle supply equipment ecosystem. Together, they are focused on scaling the deployment of these next-generation chargers.
The goal is to implement this infrastructure across various US cities. By leveraging the partnership's combined resources and capabilities, the initiative seeks to rapidly expand the network of accessible charging points. This strategic alliance is positioned to significantly impact the urban EV landscape by prioritizing speed and efficiency in infrastructure rollout.
Strategic Impact on US Cities
Deploying chargers in hours, not months represents a significant shift in urban planning for electric vehicles. This rapid installation capability allows cities to adapt more quickly to the transition toward electrification. It enables a more responsive approach to meeting charging demand where it is highest—in residential and commercial districts.
The scalability of the lamppost charger model is a key factor in its potential success. As Voltpost and EVSE continue their rollout, the focus remains on overcoming the traditional barriers of urban EV infrastructure. This method provides a blueprint for other metropolitan areas looking to accelerate their green energy initiatives without disrupting city life with prolonged construction projects.
Conclusion
The partnership between Voltpost and EVSE marks a pivotal step in the evolution of EV infrastructure. By solving the critical issue of installation speed, they are enabling US cities to deploy charging networks more effectively. This innovation is essential for supporting the growing number of electric vehicles on the road and ensuring that urban environments remain livable and sustainable.




