R$14 Million Investment Transforms Key Piauí Highway
Politics

R$14 Million Investment Transforms Key Piauí Highway

A major infrastructure project is underway to modernize the PI-115 highway, a vital 54-kilometer corridor serving over 25,000 residents in central Piauí.

G1 Globo2h ago
5 min read
📋

Quick Summary

  • 1The State Government is investing R$14 million to completely recover the PI-115 highway.
  • 2The project covers a 54.
  • 3Improvements include pavement, drainage, and new signage under the 'Estradas Seguras' program.
  • 4The works are scheduled for completion by April 2026, benefiting more than 25,000 people.

A New Era for Regional Connectivity

A significant infrastructure upgrade is reshaping travel across central Piauí. The State Government has committed R$14 million to the full recovery of the PI-115 highway, a critical artery linking two important municipalities.

This investment targets the complete revitalization of the 54.20-kilometer route. The project aims to transform a vital transportation link into a modern, safe, and efficient corridor for thousands of daily commuters and local residents.

Scope of the Revitalization

The comprehensive recovery project is being executed by the Departamento de Estradas de Rodagem (DER-PI). The scope of work is extensive, addressing multiple aspects of road infrastructure to ensure long-term durability and safety.

Key interventions are focused on three primary areas:

  • Pavement Restoration: Laying a new, durable asphalt surface.
  • Drainage Systems: Implementing interventions to manage water flow and prevent erosion.
  • Modern Signage: Installing new traffic signs to improve driver guidance and safety.

These improvements are part of the broader Programa Estradas Seguras (Safe Roads Program), which prioritizes the modernization of the state's road network.

"The work of fortalecimento da infraestrutura de transportes segue com a missão principal que é permitir trafegabilidade segura e eficiente, protegendo os usuários. A população desses dois municípios soma mais de 25 mil habitantes e, portanto, ao término das obras que está previsto para abril deste ano, teremos mais uma rodovia em ótimas conditions."
Leo Sobral, General Director, DER-PI

Impact on Local Communities

The highway connects the cities of São Miguel do Tapuio and Assunção do Piauí. The combined population of these two municipalities exceeds 25,000 inhabitants, all of whom will directly benefit from the enhanced infrastructure.

Leo Sobral, the general director of DER-PI, emphasized the project's core mission. He stated that the work is part of a larger effort to strengthen transport infrastructure, with the primary goal of ensuring safe and efficient traffic flow while protecting all users of the road.

“The work of fortalecimento da infraestrutura de transportes segue com a missão principal que é permitir trafegabilidade segura e eficiente, protegendo os usuários. A população desses dois municípios soma mais de 25 mil habitantes e, portanto, ao término das obras que está previsto para abril deste ano, teremos mais uma rodovia em ótimas conditions.”

Addressing High Traffic Volume

The necessity of this investment is underscored by the highway's heavy usage. According to data from DER-PI, the PI-115 route supports an average of 3,000 vehicles per day.

This high volume of daily traffic highlights the intense demand placed on the existing infrastructure. The data validates the need for significant improvements to handle current and future transportation needs effectively.

“E esse dado reforça a demanda de utilização intensa da via, o que justifica todas essas melhorias e esse investimento,”

concluded Leo Sobral, reinforcing that the project is a direct response to the region's logistical requirements.

Project Timeline and Outlook

The revitalization of the PI-115 is on a clear schedule. Officials have set a target completion date for April 2026. This timeline ensures that the project moves forward efficiently, minimizing long-term disruption while delivering substantial upgrades.

Upon completion, the highway will be fully equipped to serve the region's needs. The investment promises a road in optimal condition, ready to support economic activity and safe travel for years to come.

Looking Ahead

The R$14 million investment in the PI-115 highway represents a strategic commitment to regional development and public safety. By modernizing this essential corridor, the state is laying the groundwork for improved connectivity and economic vitality in São Miguel do Tapuio and Assunção do Piauí.

As the April 2026 deadline approaches, the transformed highway will stand as a testament to the importance of sustained infrastructure investment in fostering community growth and ensuring safe passage for all.

"E esse dado reforça a demanda de utilização intensa da via, o que justifica todas essas melhorias e esse investimento."
Leo Sobral, General Director, DER-PI

Frequently Asked Questions

The State Government is investing R$14 million to completely recover the PI-115 highway. This project involves a full revitalization of the 54.20 km road connecting São Miguel do Tapuio and Assunção do Piauí.

The highway serves over 25,000 residents and handles an average of 3,000 vehicles daily. The investment addresses critical infrastructure needs to ensure safe and efficient travel for a large portion of the regional population.

The construction is currently underway and is scheduled for completion by April 2026. Once finished, the road will feature a new pavement, improved drainage, and modern signage, significantly enhancing its condition and safety.

#G1

Continue scrolling for more

🎉

You're all caught up!

Check back later for more stories

Back to Home